基于压力平衡条件下“戴帽”固井注水泥技术探讨

景龙, 李兴权, 鲍石磊, 李砚智, 张成. 2023. 基于压力平衡条件下“戴帽”固井注水泥技术探讨. 钻探工程, 50(2): 80-85. doi: 10.12143/j.ztgc.2023.02.011
引用本文: 景龙, 李兴权, 鲍石磊, 李砚智, 张成. 2023. 基于压力平衡条件下“戴帽”固井注水泥技术探讨. 钻探工程, 50(2): 80-85. doi: 10.12143/j.ztgc.2023.02.011
JING Long, LI Xingquan, BAO Shilei, LI Yanzhi and ZHANG Cheng, . 2023. Discussion of cement injection technology for “cap” cementation based on balanced pressure condition. DRILLING ENGINEERING, 50(2): 80-85. doi: 10.12143/j.ztgc.2023.02.011
Citation: JING Long, LI Xingquan, BAO Shilei, LI Yanzhi and ZHANG Cheng, . 2023. Discussion of cement injection technology for “cap” cementation based on balanced pressure condition. DRILLING ENGINEERING, 50(2): 80-85. doi: 10.12143/j.ztgc.2023.02.011

基于压力平衡条件下“戴帽”固井注水泥技术探讨

  • 基金项目:

    河北省地质矿产勘查开发局项目“河北平原深部基岩热储钻探关键技术研究”(编号13000022P003294101122)

详细信息
    作者简介: 景龙,男,汉族,1978年生,钻探工程专业,主要从事钻探技术及管理工作,河北省衡水市红旗大街808号地质大厦,jing_longd@163.com。

Discussion of cement injection technology for “cap” cementation based on balanced pressure condition

  • 在地热井漏失地层进行“戴帽”固井注水泥难度大,往往因挤入的水泥浆偏离设计位置而导致固井失败。本文提出了漏失层“戴帽”固井的技术思路,即利用井内液柱压力与地层裂隙压力保持平衡以有效控制固井水泥浆柱移动位置,通过控制挤注排量以防止水泥浆被稀释。在具体实施中,可以采用开放固井和封闭固井两种方式。前者在注替浆过程中,井筒与外界大气、上下井筒之间始终相通。当上下套管级差较大时,水泥浆柱在平衡过程中下移距离较长,位置不易控制,且易稀释,但是所需工具简单,适合应用于上下套管级差较小的条件,尤其是在同级套管内。对于后者而言,需采用特殊密封工具封闭下部套管,在注替浆过程中,上下井筒始终是不通的。可以避免水泥浆柱下移距离长、位置不易控制、易稀释等缺点,适合各种套管级配条件下固井注水泥作业,在套管级差较大时更显其精确封固优势。
  • 加载中
  • [1]

    DZ/T 0260—2014, 地热钻探技术规程[S].DZ/T 0260—2014, Technical specification for geothermal well drilling[S].

    [2]

    [2] 伍晓龙,杜垚森,王庆晓.冀中坳陷区域JZ04井钻井工程设计[J].钻探工程,2021,48(7):84-90.

    WU Xiaolong, DU Yaosen, WANG Qingxiao. Drilling design of Well JZ04 in the Jizhong depression region[J]. Drilling Engineering, 2021,48(7):84-90.

    [3]

    [3] 孟祥瑞,谢永德,祁新堂,等.平顶山北地热示范区PBR01井钻探技术研究与分析[J].钻探工程,2021,48(S1):264-268.

    MENG Xiangrui, XIE Yongde, QI Xintang, et al. Drilling technology for PBR01 geothermal well in North Pingdingshan Geothermal Demonstration Zone[J]. Drilling Engineering, 2021,48(S1):264-268.

    [4]

    [4] 潘德元,何计彬,杨涛,等.雄安牛驼镇地热田岩溶热储层地热深井井身结构优化设计[J].钻探工程,2021,48(2):78-84.

    PAN Deyuan, HE Jibin, YANG Tao, et al. Optimization design of the geothermal wellbore structure in karst reservoir[J]. Drilling Engineering, 2021,48(2):78-84.

    [5]

    [5] 俱养社,张玉贵.韩城地区中深层钻井取热供暖关键技术[J].钻探工程,2021,48(12):79-85.

    JU Yangshe, ZHANG Yugui. Key technology for middeep drilling geothermal heat extraction in the Hancheng area[J]. Drilling Engineering, 2021,48(12):79-85.

    [6]

    [6] 胡晋军,和国磊,耿志山,等.天津CGSD01地热调查井固井技术[J].探矿工程(岩土钻掘工程),2020,47(1):26-30.HU Jinjun, HE Guolei, GENG Zhishan, et al. Cementing technology for Tianjin CGSD01 geothermal survey well [J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(1):26-30.

    [7]

    [7] 钱洪强,王娟,孙玉东,等.天津地区地热钻井中地层漏失分析及堵漏方法选择[J].地质调查与研究,2016,39(3):226-230.

    QIAN Hongqiang, WANG Juan, SUN Yudong, et al. Analysis of leakage formation and selection of leaking stoppage methods in geothermal well drilling in Tianjin area[J]. Geological Survey and Research, 2016,39(3):226-230.

    [8]

    [8] 吕利强.雄安新区地热井钻探施工难点及措施[J].中国煤炭地质,2019,31(10):69-72.

    Liqiang LÜ. Difficulty and measures of geothermal well drilling in Xiong’an New Area[J]. Journal of China Coal Geology, 2019,31(10):69-72.

    [9]

    [9] 刘文武,刘家荣,郭坤,等.雄安新区D14地热井钻探施工技术研究[J].西部探矿工程,2019,31(8):102-106.

    LIU Wenwu, LIU Jiarong, GUO Kun, et al. Research on drilling and construction technology of D14 geothermal well in Xiong’an New Area[J]. West-China Exploration Engineering, 2019,31(8):102-106.

    [10]

    [10] 高鹏举,董向宇,马峰,等.雄安新区D15地热勘探井钻探施工技术[J].钻探工程,2021,48(3):106-112.

    GAO Pengju, DONG Xiangyu, MA Feng, et al. Drilling technology for D15 geothermal exploration well in Xiong’an New Area[J]. Drilling Engineering, 2021,48(3):106-112.

    [11]

    [11] 易亚东,余中岳,高兴宝.下套管失返性漏失正注反挤置换法工艺技术[J].探矿工程(岩土钻掘工程),2020,47(5):27-31.

    YI Yadong, YU Zhongyue, GAO Xingbao. Normal injection and reverse squeeze displacement process for lost return leakage in RIH of casing[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(5):27-31.

    [12]

    [12] 樊腊生,贾小丰,王贵玲,等.雄安新区D03地热勘探井钻探施工实践[J].探矿工程(岩土钻掘工程),2020,47(10):13-22.

    FAN Lasheng, JIA Xiaofeng, WANG Guiling, et al. Drilling practice of D03 geothermal exploration well in Xiong’an New Area[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(10):13-22.

    [13]

    [13] 李砚智,张长茂,张平.漏失量较大地层“戴帽”固井技术[J].探矿工程(岩土钻掘工程),2019,46(7):41-44,50.LI Yanzhi, ZHANG Changmao, ZHANG Ping.Top fill cementing technology for large loss formation[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(10):13-22.

    [14]

    [14] 祁新堂,谢永德,郭佳欢,等.平顶山北地热示范区PBR01井钻探施工实践[J].钻探工程,2021,48(S1):275-280.

    QI Xintang, XIE Yongde, GUO Jiahuan, et al. Drilling of Well PBR01 in the North Pingdingshan Geothermal Demonstration Area[J]. Drilling Engineering, 2021,48(S1):275-280.

  • 加载中
计量
  • 文章访问数:  432
  • PDF下载数:  124
  • 施引文献:  0
出版历程
收稿日期:  2022-09-16
修回日期:  2022-11-13

目录