SHORELINE SHIFTING AND MORPHOLOGY CHANGES OF THE TIDAL FLAT-SHALLOW SEA AREA OFF HUANGHUA HARBOR
-
摘要: 在黄骅港附近岸段开展了岸线实地调查和潮间带年际监测,并结合历史资料和图鉴对比等手段,对黄骅港两侧岸线变迁及滩面-浅海区形态变化过程及其趋势进行了综合研究。结果显示:(1)黄骅港附近的岸线(老狼坨子岸段、大口河岸段)在过去50余年间普遍经历了岸线的蚀退过程。但进入20世纪80年代、特别是90年代黄骅港建设以来,建港及围海造陆工程使老狼坨子-冯家堡段的海岸线人为向海推进,而大口河岸段因人类活动较少、以及黄骅港防砂堤对沿岸流的阻隔,其岸线仍基本保持蚀退状态。(2)黄骅港建港对北侧的老狼坨子潮间带影响明显,造成该区现代沉积作用极为活跃,2004-2006年的滩面监测结果显示,其总体上保持淤高的趋势。南侧的大口河潮间带,2005-2007年的滩面监测结果显示,潮间带上部未见明显的变化、潮间带下部明显淤高。与80年代数据对比显示,这两个滩面的坡度均变缓。(3)近30年来,黄骅港海域河流作用日益减弱,海洋动力不断增强,塑造了废弃三角洲中-晚期地貌组合和潮道-泻湖沉积体系。1995年黄骅港建港以来,海洋水动力发生局部变化,并参与了对部分浅海区海底形态的塑造,但现有的数据表明,其影响仅限于潮间带和港口-航道防砂堤附近。Abstract: Shoreline surveys were carried out on the coastal zone near Huanghua Harbor.Two annual monitoring intertidal cross sections were launched on both sides of the Port. Combined with historical data and through illustrations comparison,the shoreline shifting and morphology changes of the tidal flat-shallow sea area were studied comprehensively.Results show that:(1)in the past 50 years,the shoreline near Huanghua Port(Laolangtuozi and Dakouhe coastal zone)has experienced a widespread retreat due to erosion.However,starting from 1980s,especially since the 1990s,the construction of Huanghua Harbor and Bohai New Area have made the shoreline moved forward towards the sea from Laolangtuozi to Fengjiapu.On the contrary,the shoreline around Dakouhe have remained retreating state because there is lack of human activities,and the Huanghua Port acts as a barrier to break the longshore current.(2)Huanghua Port construction has resulted in a high-rate sedimentation on Laolangtuozi in the north side of the harbor;the Dakouhe tidal flat in the south side of the Harbor,howerver,has no apparent change happened in the upper part,and siltation has only happened in the lower part based on the data from 2005 to 2007.Compared with the data of 1980s,it suggests that the slope of the tidal flat has become smaller.(3)In the past 30 years,with the decrease in river process and the increase in marine hydrodynamics,a middle-late stage abandoned delta and a tidal channel-lagoon system have been formed.Since 1995, with the construction of Huanghua Harbor,the marine hydrodynamic system has changed locally to be a force in shaping the morphology of shallow sea area,but the available data indicate that the impact is limited to the north tidal flat and the sea area near the sand embankment of the port.
-
Key words:
- shoreline shifting /
- morphology /
- tidal flat /
- shallow sea /
- Huanghua Harbor
-
-
[1] 李春初.大口河海岸特性和黄骅港的扩建问题[J].港口工程,1993,5:6-14.[LI Chunchu.Coastal characteristics of Dakouhe and the problems of Huanghua Harbor expansion[J].Harbour Engineering,1993
,5:6-14.]
[2] 李春初,阎新兴.黄骅港海岸动力地貌条件及与一期工程关系的分析[J].水道港口,1996,2:19-24.[LI Chunchu,YAN Xinxing.Analysis to the relation between coastal dynamic geomorphic condition of the area of Dakouhe River and the first period project of Huanghua Harbor[J].Journal of Waterwave and Harbor,1996
,2:19-24.]
[3] Penland S,Boyd R,Nummedal D,et al. H.Deltaic barrier development on the Louisiana coast[J].Gulf Coast Assoc.Geol.Socs.,1981,31(Suppl.):471-476.
[4] 张庆河,王崇贤,杨华,等.黄骅港海域表层泥砂特性及其影响[J].中国港湾建设,2004,4:14-17.[ZHANG Qinghe,WANG chongxian,YANG hua,et al.Property and influence of sediments on seabed surface around Huanghua Harbor[J].China Harbour Engineering,2004
,4:14-17.]
[5] [6] 周斌,王志勇,邓岳.黄骅港外航道整治工程海域使用论证报告[R].国家海洋局大连海洋工程勘查设计和环境保护开发中心、交通部水运工程科学研究所,2004.[ZHOU Bin,WANG Zhiyong,DENG Yue.Report on the use of sea area on the project of the regulation of Huanghua Harbor outside channel[R].Dalian Marine Engineering Design and Environmental Exploration and Development Center,SOA,Tianjin Research Institute for Water Transport Engineering,MOC,2004.]
[7] 张庆河,张娜,顾明,等.黄骅港泥砂静水沉降特性研究[J].港工技术,2005,1:1-4.[ZHANG Qinghe,ZHANG Na,GU Ming,et al.Settling properties of Huanghua Harbour sediment in still water[J].Port Engineering Technology,2005
,1:1-4.]
[8] 杨华,侯志强.黄骅港外航道泥砂淤积问题研究[J].水道港口,2004,25(增刊):59-63.[YANG Hua,HOU Zhiqiang.Study on siltation in the outer channel of Huanghua Harbor[J].Journal of waterway and Harbour,2004
,25(Suppl.):59-63.]
[9] 张庆河,林全泓,秦崇仁,等.黄骅港海域沿堤流现象遥感图像分析[J],中国港湾建设,2004,1:29-31.[ZHANG Qinghe,LIN Quanhong,QIN Chongren,et al.Investigation of currents along breakwater for Huanghua Prot with help of satellite remote sensing images[J].China Harbour Engineering,2004
,1:29-31.]
[10] 王福,裴艳东,李建芬,等.天津潮间带高程与滨海新区城市安全[J].地质通报,2010,29(4):682-687.
[WANG Fu,PEI Yandong,LI Jianfen,et al.Current elevation of Tianjin tidal zone and urban safety of Binhai New Area,China[J].Geological Bulletin of China,2010,29(4):682-687.]
[11] 翟乾祥.渤海西岸的形成和演变过程:关于华北平原全新世的一些问题[M].天津博物馆、天津市历史博物馆,1976:1-41.[ZHAI Qianxiang.The formation and evolution of Bohai Bay:some Holocene problems on the North China Plain[M].Tianjin Museum,Tianjin History Museum,1976:1
-41.]
[12] 蔡爱智.渤海湾贝壳堤成因初步研究[J].海洋科学集刊,1981,18:117-132.[CAI Aizhi.Preliminary study on formation of chenier on Bohai Bay[J].Bulletin of Marine Science,1981
,18:117-132.]
[13] 王宏,李建芬,张玉发,等.泥质海岸带现代地质作用(沉积、剥蚀与岸线变迁)与精细测年[R].天津地质矿产研究所科研项目报告,2002.[WANG Hong,LI Jianfen,ZHANG Yufa, et al.Modern Sedimentation of the Muddy Coast(Accumulation Rate,Erosion and Coastline Change)and High Resolution Dating Report[R].Tianjin Institute of Geology and Mineral Resources,China,2002.]
[14] 赵振宏,刘增寿.黄骅港开发区主要环境工程地质问题及防治对策[J].华北地质矿产杂志,1999,14(2):226-230.
[ZHAO Zhenhong, LIU Zengshou.The mian problems of environmental engineering geology and the countermeasures in the developing area of Huanghua,Hebei Province[J].J. Geol. & Min. Res. North China,1999,14(2):226-230.]
[15] 恽才兴.渤海湾典型岸段近岸过程研究[J].中国工程科学,2001,3(3):41-51.
[YUN Caixing.Research on the near shore process of the typical coastal coast of the Bohai Bay[J].Engineering Science,2001,3(3):41-51.]
[16] 王福,裴艳东,刘志广,等.137Cs示踪的黄骅港两侧海区的沉积特征[J].地质通报,2008,27(7):1054-1059.
[WANG Fu,PEI Yandong,LIU Zhiguang,et al.Sedimentary characteristics of Huanghua Harbour traced by 137Cs[J].Geological Bulletin of China,2008,27(7):1054-1059.]
[17] 孙延智,武心尧.黄骅地区潮间带滩涂沉积特征及其影响因素的初步分析[J].海洋与湖沼通报,1992,1:58-62.[SUN Yanzhi,WU Xinrao.A preliminary analysis of the sedimentary characteristics and their influential factors in the tidal flat in Huanghua County,Hebei Province[J].Transactions of Oceanology and Limnology,1992
,1:58-62.]
[18] 徐家声,刘鹤智.黄骅海岸带开发环境概论[M].海洋出版社,1991.[XU Jiasheng,LIU Hezhi.Environmental Study of the Development of Huanghua Coastal Area[M].Ocean Press,1991.]
[19] 石青峰,吴桑云,王文海.黄骅港地区潮滩过程与港口选址[J].海岸工程,2005,24(4):17-26.
[SHI Qingfeng,WU Sangyun,WANG Wenhai.Tidal bank process and harbor site selection in Huanghua Harbor area[J].Coastal Engineering,2005,24(4):17-26.]
[20] 刘刻福,李宗刚.渤海湾北部及西南部潮间浅滩的基本特征及其演变[J].海洋调查,1987,2:10-19.[LIU Kefu,LI Zonggang.The features and evolution of tidal flat on North and Northwest of Bohai Bay[J].Marine Survey,1987
,2:10-19.]
[21] 杨桂山,施雅风,季子修.江苏淤泥质潮滩对海平面变化的形态响应[J].地理学报,2002,57(1):76-84.
[YANG Guishan,SHI Yafeng,JI Zixiu.The morphological response of typical mud flat to sea level change in Jiangsu coastal plain[J].Acta Geographica Sinica,2002,57(1):76-84.]
-
计量
- 文章访问数: 1534
- PDF下载数: 1
- 施引文献: 0