锦屏二级水电站引水隧洞岩溶水防治思想的演变

林玉山, 张之淦, 李术才, 李树忱, 钟世航, 何发亮. 锦屏二级水电站引水隧洞岩溶水防治思想的演变[J]. 水文地质工程地质, 2007, (6): 19-23,94. doi: 10.3969/j.issn.1000-3665.2007.06.006
引用本文: 林玉山, 张之淦, 李术才, 李树忱, 钟世航, 何发亮. 锦屏二级水电站引水隧洞岩溶水防治思想的演变[J]. 水文地质工程地质, 2007, (6): 19-23,94. doi: 10.3969/j.issn.1000-3665.2007.06.006
LIN Yu-shan, ZHANG Zhi-gan, LI Shu-cai, LI Shu-chen, ZHONG Shi-hang, HE Fa-liang. Prediction and control of karst water inflow into diversion tunnel of Jinping stage 2 hydropower station[J]. Hydrogeology & Engineering Geology, 2007, (6): 19-23,94. doi: 10.3969/j.issn.1000-3665.2007.06.006
Citation: LIN Yu-shan, ZHANG Zhi-gan, LI Shu-cai, LI Shu-chen, ZHONG Shi-hang, HE Fa-liang. Prediction and control of karst water inflow into diversion tunnel of Jinping stage 2 hydropower station[J]. Hydrogeology & Engineering Geology, 2007, (6): 19-23,94. doi: 10.3969/j.issn.1000-3665.2007.06.006

锦屏二级水电站引水隧洞岩溶水防治思想的演变

详细信息
  • 中图分类号: P642.254

Prediction and control of karst water inflow into diversion tunnel of Jinping stage 2 hydropower station

  • 锦屏二级水电站引水隧洞是一座高外水压力、大涌水量的岩溶越岭长隧.建设中遇到了隧道岩溶水防治世界级难题.目前引水隧洞施工在即.本文对40多年来锦屏引水隧洞涌水预测、施工地质预报、治水三方面成果和思路的演变进行了总结.强调锦屏防治水思路的历史演变是在工作中不断实践-认识-再实践-再认识的一个健康发展过程,既及时吸取了国内岩溶区越岭深隧建设的成功经验,也为我国岩溶地区隧洞施工防治水技术开发和不断发展做出了贡献.基于当前最新认识,认为只要在建设中认真开展信息化动态设计和施工,引水隧洞的顺利施工是有充分技术准备和保证的.
  • 加载中
  • 加载中
计量
  • 文章访问数:  365
  • PDF下载数:  0
  • 施引文献:  0
出版历程
刊出日期:  2007-12-15

目录