Hand-dug Rock Socketed Pile Construction for a Building in Shenzhen
计量
- 文章访问数: 314
- PDF下载数: 11
- 施引文献: 0
引用本文: | 陈协理. 深圳某大厦人工挖孔嵌岩桩施工方法[J]. 钻探工程, 2000, (z1): 8-9,12. doi: 10.3969/j.issn.1672-7428.2000.z1.004 |
Citation: | Hand-dug Rock Socketed Pile Construction for a Building in Shenzhen[J]. DRILLING ENGINEERING, 2000, (z1): 8-9,12. doi: 10.3969/j.issn.1672-7428.2000.z1.004 |