Construction Technique of Pre-Stressed Anchor Ropes Fixed in Two Ends
计量
- 文章访问数: 127
- PDF下载数: 7
- 施引文献: 0
引用本文: | 刘义. 紫坪铺预应力对穿锚索施工工艺[J]. 钻探工程, 2003, (z1): 112-113. doi: 10.3969/j.issn.1672-7428.2003.z1.037 |
Citation: | Construction Technique of Pre-Stressed Anchor Ropes Fixed in Two Ends[J]. DRILLING ENGINEERING, 2003, (z1): 112-113. doi: 10.3969/j.issn.1672-7428.2003.z1.037 |