Examination of Casing Abutment Scaling Failure in HIS Geothermal Well and the Plugging Method
计量
- 文章访问数: 151
- PDF下载数: 4
- 施引文献: 0
引用本文: | 刘文新, 张长茂, 鲍洪智. HLS地热井井管对接密封失效的检查方法及封堵措施[J]. 钻探工程, 2008, (12): 17-18. doi: 10.3969/j.issn.1672-7428.2008.12.006 |
Citation: | Examination of Casing Abutment Scaling Failure in HIS Geothermal Well and the Plugging Method[J]. DRILLING ENGINEERING, 2008, (12): 17-18. doi: 10.3969/j.issn.1672-7428.2008.12.006 |