陕西宝鸡市渭河北岸蔡家坡工程滑坡活动强度评估

辛 鹏1, 吴树仁1, 石菊松1, 王 涛1, 石 玲1, 韩金良1, 何晓磊2. 陕西宝鸡市渭河北岸蔡家坡工程滑坡活动强度评估[J]. 地质通报, 2013, 32(12): 1952-1961.
引用本文: 辛 鹏1, 吴树仁1, 石菊松1, 王 涛1, 石 玲1, 韩金良1, 何晓磊2. 陕西宝鸡市渭河北岸蔡家坡工程滑坡活动强度评估[J]. 地质通报, 2013, 32(12): 1952-1961.
XIN Peng1, WU Shu-ren1, SHI Ju-song1, WANG Tao1, SHI Ling1, HAN Jin-liang1, HE Xiao-lei2. Assessment of the activity intensity of Caijiapo engineering landslide on the north bank of Weihe River in Baoji City[J]. Geological Bulletin of China, 2013, 32(12): 1952-1961.
Citation: XIN Peng1, WU Shu-ren1, SHI Ju-song1, WANG Tao1, SHI Ling1, HAN Jin-liang1, HE Xiao-lei2. Assessment of the activity intensity of Caijiapo engineering landslide on the north bank of Weihe River in Baoji City[J]. Geological Bulletin of China, 2013, 32(12): 1952-1961.

陕西宝鸡市渭河北岸蔡家坡工程滑坡活动强度评估

Assessment of the activity intensity of Caijiapo engineering landslide on the north bank of Weihe River in Baoji City

  • 为研究大型工程扰动区滑坡的活动强度,以引渭渠水利工程穿越的蔡家坡斜坡带为例,概括了滑坡活动强度的评价方法,在地质调查与勘察、收集滑坡变形历史资料、大比例尺地形测绘及易滑地层力学试验的基础上,运用地貌过程分析、动态数值模拟2种计算方法,探讨研究蔡家坡段各斜坡单元可能的变形形式与强度,评估了新滑坡单体的滑动速度与距离。结果表明,北坡斜坡带受工程扰动后,古滑坡体受工程扰动最为敏感,老、新滑坡体次之。南社头古滑坡复活是工程竣工后的极端滑坡事件,陕棉九厂、蔡家坡滑坡的蠕变变形加速受到引渭渠渗漏地下水交换增快的影响;蔡家坡段高活动区集中于陕棉九厂老滑坡、蔡家坡新滑坡、农副公司老滑坡前缘,而大型滑坡体周缘的地貌陡坎为中活动区,受降雨诱发的浅层崩塌、泥流的影响;蔡家坡新滑坡坡面变形活动由后缘向坡脚传递,后缘下降,前缘隆起。蠕变过程中,X方向速度达到的最大值约1.0m/s,Y方向速度达到的最大值约1.5 m/s。块体滑动过程中,滑动最大距离约130m。其中,X方向速度最大约4.5m/s,Y方向速度最大约4.0m/s。
  • 加载中
  • 加载中
计量
  • 文章访问数:  675
  • PDF下载数:  353
  • 施引文献:  0
出版历程
刊出日期:  2013-12-15

目录