Drilling technology for geostress monitoring holes in Beijing-Tianjin-Hebei Collaborative Development Region
-
摘要: 地应力监测孔作为地应力测量与监测的基础场所,钻探施工的质量直接影响到地应力测量试验的效果,扩孔的质量更是决定地应力监测仪器能否顺利安装以及后期监测仪器能否正常工作的关键因素。本文以京津冀协同发展区地应力监测孔钻探施工为例,详细介绍了地应力监测孔的施工工艺,包括取心钻具组合、金刚石钻头选择、组装式扩孔钻头分级扩孔钻进等,对保证钻孔垂直度和同心度、降低钻孔孔径误差、保证岩心采取率,以及提高监测孔扩孔效率和质量等关键技术提出了一些具体措施,并取得了良好的钻探效果,对今后地应力监测孔的钻探施工具有重要的指导作用。Abstract: Geostress monitoring holes function as the base of geostress measurement and monitoring; thus, the drilling quality directly affects the effect of geostress measurement, and the reaming quality is the key factor to decide whether the geostress monitoring instrument can be installed smoothly and whether the monitoring instrument can work normally. Great attention should be paid to the drilling work of geostress monitoring holes, and research on drilling technology for geostress monitoring holes should be strengthened. Taking the drilling of a geostress monitoring hole in the Beijing-Tianjin-Hebei Collaborative Development Region as an example, this paper introduces the drilling technology for geostress monitoring holes in detail, including configuration of the core drilling string, selection of the diamond bit, step reaming with the modular reaming bit; and it also proposes some concrete measures to ensure the verticality and concentricity of monitoring holes, reduce the error in hole diameter, ensure core recovery, and improve reaming efficiency and quality, which have led to good drilling results. They can provide important guide for drilling of the geostress monitoring hole in the future.
-
-
[1] 张重远,吴满路,陈群策,等.地应力测量方法综述[J].河南理工大学学报(自然科学版),2012,31(3):305-309.
ZHANG Chongyuan, WU Manlu, CHEN Qunce, et al. Review of in-situ stress measurement methods[J]. Journal of Henan Polytechnic University (Natural Science), 2012,31(3):305-309.
[2] [2] 景峰,盛谦,张勇慧,等,我国原位地应力测量与地应力场分析研究进展[J].岩土力学,2011,32(S2):51-58.
JING Feng, SHENG Qian, ZHANG Yonghui, et al. Study advance on in-site geostress measurement and analysis of initial geostress field in China[J]. Rock and Soil Mechanics, 2011,32(S2):51-58.
[3] [3] 王勇军,赵长亮,张明德,等.垦利东兴地区深层卤水普查井钻井技术[J].探矿工程(岩土钻掘工程),2015,42(6):28-31.
WANG Yongjun, ZHAO Changliang, ZHANG Mingde, et al. Drilling technology for deep brine reconnaissance wells in Kenli Dongxing area[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(6):28-31.
[4] [4] 刘志祥,刘路宾.地应力钻孔施工工艺[J].广西地质,1994,7(4):57-61.
LIU Zhixiang, LIU Lubin. Construction technique of geostress drill holes[J]. Guangxi Geology, 1994,7(4):57-61.
[5] [5] 北京市地质工程设计研究院.京津冀协同发展区活动断裂地应力测量与实时监测钻探工程及试验配合服务项目竣工报告[R].2016.Beijing Institute of Geological Engineering Design and Research. Completion report of active faults geostress measurement and real-time monitoring drilling project and test coordination service project in Beijing-Tianjin-Hebei Coordinated Development Region[R]. 2016.
[6] [6] 秦沛.北京(密云)地应力监测孔钻探技术[J].探矿工程(岩土钻掘工程),2015,42(1):38-42.
QIN Pei. Drilling technology for ground stress monitoring borehole in Beijing[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(1):38-42.
[7] [7] 秦俊生,谭成轩,刘春生.地应力钻孔施工关键技术探讨[J].城市地质,2016,11(4):54-58.
QIN Junsheng, TAN Chengxuan, LIU Chunsheng. Key technology analysis on stress borehole operating[J]. Urban Geology, 2016,11(4):54-58.
[8] [8] 王三牛,王聪,刘玮,等.科学深钻扩孔钻头及钻进技术研究[J].探矿工程(岩土钻掘工程),2012,39(3):8-13.
WANG Sanniu, WANG Cong, LIU Wei, et al. Study on reaming bit for scientific drilling and the drilling technique[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2012,39(3):8-13.
[9] [9] 严一华,汪拾金.基岩标的施工技术探讨与实践[J].探矿工程(岩土钻掘工程),2012,39(3):55-58.
YAN Yihua, WANG Shijin. Discussion of construction technique of bedrock bench mark and the practice[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2012,39(3):55-58.
[10] [10] 谭春亮,宋殿兰,岳永东,等.北京地震台白家疃观测井钻探施工技术[J].探矿工程(岩土钻掘工程), 2018,45(1):19-23.
TAN Chunliang, SONG Dianlan, YUE Yongdong, et al. Construction technology of drilling from Baijiatuan Monitoring Well at Beijing Seismic Station[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2018,45(1):19-23.
[11] [11] 张建杰,刘春生.分级扩孔技术在地应力钻孔施工中的应用[J].西部探矿工程,2017(10):19-22.
ZHANG Jianjie, LIU Chunsheng. The application of graded reaming technology in geostress drill hole construction[J]. West-China Exploration Engineering, 2017(10):19-22.
[12] [12]
[S].DZ/T 0227—2010 ,地质岩心钻探规程 [S].DZ/T 0227—2010 , Geological core drilling regulations[13] [13] 焦聚博,侯红,孙凯.煤矿井下保直钻进技术现状及展望[J].钻探工程,2021,48(7):14-19.
JIAO Jubo, HOU Hong, SUN Kai. State and prospect of underground straight drilling technology in coal mines[J]. Drilling Engineering, 2021,48(7):14-19.
[14] [14]
DD 2010—01,地质调查岩心钻探技术规程(试行) [S].DD 2010-01, Technical specification for geological survey core drilling (for trial implementation) [S]. 2010.[15] [15] 白刚.煤矿井下定向钻孔超长套管下放技术[J].钻探工程,2021,48(6):57-62.
BAI Gang. RIH of over-long casing in underground directional boreholes in coal mines[J]. Drilling Engineering, 2021,48(6):57-62.
[16] [16] 徐克里,王生.钻探工程[M].北京:地质出版社,2011.XU Keli, WANG Sheng. Drilling Engineering[M]. Beijing: Geological Publishing House, 2011.
[17] [17] 刘广志.金刚石钻探手册[M].北京:地质出版社,1991.LIU Guangzhi, et al. Diamond Drilling Handbook[M]. Beijing: Geological Publishing House, 1991.
[18] [18] 汤凤林.岩心钻探学[M].武汉:中国地质大学出版社,1997.TANG Fenglin. Core Drilling[M]. Wuhan: China University of Geosciences Press, 1997.
-
计量
- 文章访问数: 455
- PDF下载数: 49
- 施引文献: 0