Drilling technology applied during comprehensive prospecting in the Xiaoqinling integrated exploration area
-
摘要: 小秦岭国家级整装勘查区综合物探科研钻探专项,旨在查清小秦岭地区深部地质结构及隐伏矿体的储存特征,因勘查区内没有施工过深孔,深部地质资料缺乏,施工未知因素较多,综合该钻探专项基本情况、地层岩性、钻孔深度及终孔直径,选择一套实用的钻探设备和以绳索取心钻进、LBM冲洗液体系为主要钻进工艺来满足施工需要;在施工过程中,遇到上部地层取心率低、涌水、吸附卡钻、掉块卡钻、孔内漏失、片麻岩地层防斜、起拔套管困难等技术问题,针对出现的技术问题,制定了切实可行的解决方案,对今后该矿区或类似地层钻探施工具有一定的借鉴意义。同时总结、形成了一套针对破碎、胶结性差地层的泥浆体系,在维护孔壁方面取得了良好的效果,有效预防深孔重大孔内事故,提高了施工效率,节约了钻探施工成本。Abstract: The special project of comprehensive geophysical research drilling in the Xiaoqinling national integrated exploration area aims to find out the deep geological structure and reservoir characteristics of the hidden ore bodies in the Xiaoqinling area. Due to lack of deep hole and deep geological data, many unknown factors exist in construction. Considering the basic condition of this special drilling project, strata lithology, drilling depth and final hole diameter, practical drilling equipments and wire-line core drilling and LBM drilling fluid system as the main drilling technology should be selected to meet the construction needs. During the drilling process, technical problems such as low core recovery rate in upper strata, water gushing, adhesion stuck, falling block stuck, leakage in the hole, anti-slope in slate layer and difficult in lifting casing were encountered. Relevant feasible solutions were made to provide certain reference for the drilling construction in this mining area or similar strata in the future. At the same time, a mud system for fractured and poorly consolidated strata was summarized and formed, which has achieved good results in maintaining the well wall, effectively preventing major accidents in deep holes, improving drilling efficiency and saving drilling costs.
-
-
[1] 李红梅,石逊.白涧铁矿南区复杂地层钻探施工技术[J].钻探工程,2021,48(11):29-34.
LI Hongmei,SHI Xun. Drilling technology for complex formation in the south area of Baijian Iron Mine[J]. Drilling Engineering, 2021,48(11):29-34.
[2] [2] 刘俊辉,陈跃,李晓东,等.广西向阳坪铀矿床钻探施工技术及改进措施[J].钻探工程,2021,48(8):59-67.
LIU Junhui, CHEN Yue, LI Xiaodong, et al. Drilling technology and improvement measures for the Xiangyangping uranium deposit in Guangx[i J]. Drilling Engineering, 2021,48(8):59-67.
[3] [3] 陈师逊,宋世杰.中国东部海区科学钻探施工技术探讨[J].探矿工程(岩土钻掘工程),2014,41(12):1-5.
CHEN Shixun,SONG Shijie. Discussion of scientific drilling construction technology in Eastern Sea Area of China[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling),2014,41(12):1-5.
[4] [4] 杨芳,陈师逊.深部地质钻探钻孔结构设计与施工分析[J].探矿工程(岩土钻掘工程),2019,46(11):21-26.
YANG Fang,CHEN Shixun. Analysis of design and construction of deep geodrilling boreholes[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(11):21-26.
[5] [5] 翟育峰.西藏甲玛3000 m科学深钻施工技术方案[J].探矿工程(岩土钻掘工程),2020,47(6):8-12,53.
ZHAI Yufeng. Technical proposal for the 3000 m deep scientific drilling borehole in Jiama, Tibet[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(6):8-12,53.
[6] [6] 刘兵.四川尔呷地吉铅锌矿区复杂地层钻探施工技术[J].钻探工程,2022,49(4):87-92.
LIU Bing. Drilling technology for complex formation in the Ergadiji lead-zinc mine area in Sichuan[J]. Drilling Engineering,2022,49(4):87-92.
[7] [7] 汤凤林,A.Γ. 加里宁,段隆臣. 岩心钻探学[M]. 武汉:中国地质大学出版社,2009.TANG Fenglin, Kalinin A. C., DUAN Longchen. Core Drilling[M]. Wuhan: China University of Geosciences Press, 2009.
[8] [8] 陈兵,姚燕,张峰,等.浅论神农架地区岩溶复杂地层钻探施工技术[J].资源环境与工程,2010(4):398-400.
CHEN Bing, YAO Yan, ZHANG Feng, et al. Discussion on drilling construction technology of complex karst stratum in Shennongjia[J]. Resources Environment & Engineering, 2010(4):398-400.
[9] [9] 肖冬顺,符文,吴琼,等. 青海五龙沟矿区泥岩地层冲洗液研究[J]. 探矿工程(岩土钻掘工程),2019,46(9):45-50.
XIAO Dongshun,FU Wen,WU Qiong,et al. Drilling fluid for mudstone in Wulonggou Mine of Qinghai province[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(9):45-50.
[10] [10] 刘祥,兰沁,许飞,等. 西藏罗布莎铬铁矿区高海拔巨厚覆盖层钻探技术[J].钻探工程,2021,48(6):49-56.
LIU Xiang,LAN Qin,XU Fei,et al. Drilling technology for massive overburden at high altitude in Luobusa chromite mine, Tibet[J]. Drilling Engineering, 2021,48(6):49-56.
[11] [11] 刘锡金.陈台沟铁矿复杂地层深孔钻探施工技术[J].探矿工程(岩土钻掘工程),2014,41(10):41-44.
LIU Xijin. Construction technology for deep hole drilling in complex formation of Chentaigou iron mine[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2014,41(10):41-44.
[12] [12] 李锦峰.恶性漏失地层堵漏技术研究[J].探矿工程(岩土钻掘工程),2019,46(5):19-27.
LI Jinfeng. The status and development direction of plugging technology for severe circulation loss formation[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(5):19-27.
[13] [13] 陶士先,李晓东,纪卫军,等.成膜防塌无固相冲洗液体系的研究与应用[C]//中国地质学会探矿工程专业委员会.
第十八届全国探矿工程(岩土钻掘工程)技术学术交流年会论文集 .北京:地质出版社,2015:424-430.TAO Shixian, LI Xiaodong, JI Weijun, et al. Research and application of solid free flushing fluid system for film forming and collapse prevention[C]//Mineral Engineering Committee,
Geological Society of China .Special for the Eighteenth National Exploration Engineering (Rock & Soil Drilling and Tunneling) Academic Conferences . Beijing: Geological Publishing House, 2015:424-430.[14] [14] 熊正强,陶士先,刘俊辉,等.延迟交联凝胶研制及其在广西某铀矿堵漏应用[J].探矿工程(岩土钻掘工程),2020,47(4):140-144.
XIONG Zhengqiang, TAO Shixian, LIU Junhui, et al. Development and application of delayed crosslinked gel for lost circulation treatment in a uranium mine of Guangxi[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(4):140-144.
[15] [15] 于志坚,耿印,于保国,等.王家庄北沟多金属矿区钻探施工技术[J].探矿工程(岩土钻掘工程),2019,46(12):29-34.
YU Zhijian, GENG Yin, YU Baoguo, et al. Drilling technology for the Beigou polymet allic mining area in Wangjiazhuang[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(12):29-34.
[16] [16] 鄢泰宁.岩土钻掘工程学[M].武汉:中国地质大学出版社,2001.YAN Taining. Geotechnical Drilling Engineering[M]. Wuhan:China University of Geosciences Press, 2001.
[17] [17]
[S].DZ/T 0227—2010 ,地质岩心钻探规程 [S].DZ/T 0227—2010 , Geological core drilling regulations[18] [18] 赵国法,吕新前.开化黄山矿区钻孔偏斜规律研究及控制措施[J]. 探矿工程(岩土钻掘工程),2015,42(2):48-52.
ZHAO Guofa,Xinqian LÜ. Study on borehole deflection law and control measures in Huangshan mining area of Kaihua[J].Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(2):48-52.
[19] [19] 李攀义,单文军,徐兆刚,等.成膜防塌无固相钻井液体系在金鹰矿区ZK1146 井中的应用研究[J].探矿工程(岩土钻掘工程),2015,42(10):26-30.
LI Panyi,SHAN Wenjun,XU Zhaogang,et al. Research and application of solid free film-forming and anti-sloughing drilling fluid system in Well ZK1146 of Jinying Mining Area[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(10):26-30.
[20] [20] 纪卫军,张辉,李晓东,等.新疆鄯善县沙尔湖页岩气3井护壁堵漏技术[J].地质装备,2018,19(4):25-27,39.
JI Weijun, ZHANG Hui, LI Xiaodong, et al. Wall-protection and plugging technology of Shaer Lake shale gas Well 3 in Shanshan,Xinjiang[J]. Equipment for Geotechnical Engineering, 2018,19(4):25-27,39.
[21] [21] 单文军,段晓青,任福建,等.甘肃武威盆地页岩气“武页1井”成膜低固相冲洗液的应用[J].探矿工程(岩土钻掘工程),2016,43(7):111-115.
SHAN Wenjun, DUAN Xiaoqing, REN Fujian, et al. Application of low solid film-forming system in Well“Wuye-1”in Wuwei Basin of Gansu[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2016,43(7):111-115.
[22] [22] 朱恒银,等.深部岩心钻探技术与管理[M].北京:地质出版 社,2014.ZHU Hengyin, et al. Technology and Management in Deep Coring Drilling[M]. Beijing:Geological Publishing House, 2014.
-
计量
- 文章访问数: 235
- PDF下载数: 58
- 施引文献: 0