Experimental Study on Mineral Processing of a Complex Refractory Gold Mine in Guizhou
-
摘要:
贵州某金矿原矿主要有回收利用价值的金矿物,原矿品位含金3.47 g/t,含硫5.12%,现场在常温条件下,用丁基黄药为捕收剂进行生产,金精矿的回收率为78.34%,金精矿品位为39.21 g/t,选矿指标不理想,造成资源浪费,严重影响企业的经济效益,针对这一情况,对该金矿进行实验研究。通过对矿浆进行加温,同时研究对该矿捕收效果良好的捕收剂丁铵黑药和丁基黄药按1:1使用,实验矿浆温度控制在50~55 ℃,与现场生产比较,金精矿浮选指标得到较大提高,实验室闭路实验得到实验结果为金精矿的品位44.86 g/t,金精矿金的回收率达到91.01%,为企业进行生产工艺流程改造提供技术依据。
Abstract:The gold mineral is the main one with recycling value in the raw ore of a gold mine in Guizhou. The gold grade of the raw ore is 3.47 g/t and the sulfur content is 5.12%. The recovery rate of the gold concentrate is 78.34% and the grade of the gold concentrate is 39.21 g/t when butyl xanthate is used as the collector for production at normal temperature. The beneficiation index is not ideal, resulting in a waste of resources. It seriously affects the economic benefit of the enterprise. In view of this situation, the experimental study is carried out on the gold mine. By heating the pulp and using the collector ammonium butyl aerofloat and butyl xanthate with good collection effect at the ratio of 1:1, the temperature of the test pulp is controlled at 50~55 ℃. Compared with the field production, the flotation index of the gold concentrate is greatly improved. The results of closed-circuit test in laboratory showed that the grade of gold concentrate was 44.86 g/t, and the recovery rate of gold concentrate was 91.01%, which provides technical basis for enterprises to reform the production process.
-
Key words:
- Mineral processing engineering /
- Gold mine /
- Flotation test /
- Heating /
- Closed-circuit test
-
-
表 1 原矿化学成分分析结果/%
Table 1. Analysis results of chemical composition of raw ores
Au* Pb Zn S CaO Ag* SiO2 Al Mg 其他 3.47 0.08 0.12 5.12 7.18 6.12 37.23 18.42 11.38 20.18 *单位为g/t。 表 2 矿石金矿物的物相分析结果
Table 2. Phase analysis results of gold minerals
名 称 黄铁矿 硅矿物 自然金 总 金 Au/(g/t) 2.63 0.82 0.02 3.47 分布率/% 72.16 23.66 4.18 100.00 表 3 矿石硫矿物的物相分析结果
Table 3. Phase analysis results of sulfur minerals
名 称 硫化物 硫酸盐 自然硫 总 硫 S/% 4.87 0.23 0.02 5.12 分布率/% 95.17 4.45 0.38 100.00 表 4 常温下开路实验结果
Table 4. Open-circuit test results at normal temperature
产 品 产率/% 品位/(g/t) 回收率/% 金精矿 5.37 42.11 65.19 中矿1 6.09 3.17 5.56 中矿2 3.23 10.18 9.47 尾 矿 85.31 0.80 19.78 给 矿 100.00 3.47 100.00 表 5 加温下的开路浮选实验结果
Table 5. Open-circuit flotation test results at elevated temperature
产 品 产率/% 品位/(g/t) 回收率/% 金精矿 6.05 43.13 75.21 中矿1 4.78 3.88 5.35 中矿2 3.29 11.12 10.53 尾 矿 85.88 0.36 8.91 给 矿 100.00 3.47 100.00 表 6 闭路实验结果
Table 6. Closed-circuit test results
产 品 产率/% 品位/(g/t) 回收率/% 金精矿 7.04 44.86 91.01 尾 矿 92.96 0.33 8.99 给 矿 100.00 3.47 100.00 -
[1] 张永涛. 中国矿产资源开发及矿产品供需关系形势分析[J]. 中国矿业, 2009, 18(2):8-11.ZHANG Y T. The development status and supply-demand situation analysis of China’s gold resources[J]. China Mining Magazine, 2009, 18(2):8-11. doi: 10.3969/j.issn.1004-4051.2009.02.003
ZHANG Y T. The development status and supply-demand situation analysis of China’s gold resources[J]. China Mining Magazine, 2009, 18(2):8-11. doi: 10.3969/j.issn.1004-4051.2009.02.003
[2] 邱曼, 黄学雄, 毛益林, 等. 我国金矿资源概况及选冶技术研究进展[J]. 矿产综合利用, 2023(3):106-115.QIU M, HUANG X X, MAO Y L, et al. General situation of gold resources and research progress of mineral processing and hydrometallurgy technology in China[J]. Multipurpose Utilization of Mineral Resources, 2023(3):106-115. doi: 10.3969/j.issn.1000-6532.2023.02.019
QIU M, HUANG X X, MAO Y L, et al. General situation of gold resources and research progress of mineral processing and hydrometallurgy technology in China[J]. Multipurpose Utilization of Mineral Resources, 2023(3):106-115. doi: 10.3969/j.issn.1000-6532.2023.02.019
[3] 赵福财, 栾东武, 丁雨坡, 等. 甘肃某含砷锑难处理金矿选矿试验研究[J]. 黄金, 2024(6): 45-49.ZHAO F C, LUAN D W , DING Y P, et al. Experiment study on dressing of a refractory ore containing arsenic and antimony in Gansu[J]. Gold, 2024(6): 45-49.
ZHAO F C, LUAN D W , DING Y P, et al. Experiment study on dressing of a refractory ore containing arsenic and antimony in Gansu[J]. Gold, 2024(6): 45-49.
[4] 陈艳波, 李光胜, 朱幸福, 等. 甘肃某含砷高硫金矿浮选实验[J]. 矿产综合利用, 2024, 45(3):206-210.CHEN Y B, LI G S, ZHU X F, et al. Flotation of an arsenic bearing high sulfur gold mine in Gansu province[J]. Multipurpose Utilization of Mineral Resources, 2024, 45(3):206-210. doi: 10.3969/j.issn.1000-6532.2024.03.032
CHEN Y B, LI G S, ZHU X F, et al. Flotation of an arsenic bearing high sulfur gold mine in Gansu province[J]. Multipurpose Utilization of Mineral Resources, 2024, 45(3):206-210. doi: 10.3969/j.issn.1000-6532.2024.03.032
[5] 董再蒸, 高鹏, 张淑敏, 等. 甘肃早子沟金矿石工艺矿物学研究[M]. 东北大学学报(自然科学版)2017(5): 712-715.DONG Z Z, GAO P, ZHANG S M, et al. Process mineralogy of gold ore in Zaozigou gold mine[M]. Gansu Province Journal of Northeastern University (Natural Science), 2017(5): 712-715.
DONG Z Z, GAO P, ZHANG S M, et al. Process mineralogy of gold ore in Zaozigou gold mine[M]. Gansu Province Journal of Northeastern University (Natural Science), 2017(5): 712-715.
[6] 李磊, 彭俊, 肖仪武, 等. 影响非洲某金矿选冶回收的矿物学因素[J]. 矿产综合利用, 2023(6):202-206.LI L, PENG J, XIAO Y W, et al. Mineralogical factors affecting beneficiation-metallurgy of a gold deposit in Africa[J]. Multipurpose Utilization of Mineral Resources, 2023(6):202-206. doi: 10.3969/j.issn.1000-6532.2023.06.031
LI L, PENG J, XIAO Y W, et al. Mineralogical factors affecting beneficiation-metallurgy of a gold deposit in Africa[J]. Multipurpose Utilization of Mineral Resources, 2023(6):202-206. doi: 10.3969/j.issn.1000-6532.2023.06.031
[7] 皇甫明柱, 盛娜, 邓久帅. 安徽某高硫金矿选矿试验[J]. 现代矿业, 2016, 32(09):82-85.HUANGFU M Z, SHENG N, DENG J S, et al. Beneficiation experiment on a high sulfur gold ore from Anhui[J]. Modern Mining, 2016, 32(09):82-85. doi: 10.3969/j.issn.1674-6082.2016.09.023
HUANGFU M Z, SHENG N, DENG J S, et al. Beneficiation experiment on a high sulfur gold ore from Anhui[J]. Modern Mining, 2016, 32(09):82-85. doi: 10.3969/j.issn.1674-6082.2016.09.023
[8] 闫军宁. 提升贵州水银洞金矿浮选工艺指标生产实践[J]. 矿产综合利用, 2022(1):164-167.YAN J N. Production practice to improve the flotation process index of Shuiyindong gold mine in Guizhou Province[J]. Multipurpose Utilization of Mineral Resources, 2022(1):164-167. doi: 10.3969/j.issn.1000-6532.2022.01.022
YAN J N. Production practice to improve the flotation process index of Shuiyindong gold mine in Guizhou Province[J]. Multipurpose Utilization of Mineral Resources, 2022(1):164-167. doi: 10.3969/j.issn.1000-6532.2022.01.022
[9] 姚金, 薛季玮, 印万忠, 等. 贵州某含硫微细粒浸染型金矿石选矿试验[J]. 金属矿山, 2016(02):77-81.YAO J, XUE J W, YIN W Z, et al. Experiments of a micro-disseminated gold ore contains sulfur in Guizhou[J]. Metal Mine, 2016(02):77-81. doi: 10.3969/j.issn.1001-1250.2016.02.016
YAO J, XUE J W, YIN W Z, et al. Experiments of a micro-disseminated gold ore contains sulfur in Guizhou[J]. Metal Mine, 2016(02):77-81. doi: 10.3969/j.issn.1001-1250.2016.02.016
[10] 袁凤香. 四川某金矿选矿工艺试验研究[J]. 现代矿业, 2023, 39(11):121-123.YUAN F X. Experimental study on beneficiation process of a gold mine in Sichuan[J]. Modern Mining, 2023, 39(11):121-123. doi: 10.3969/j.issn.1674-6082.2023.11.029
YUAN F X. Experimental study on beneficiation process of a gold mine in Sichuan[J]. Modern Mining, 2023, 39(11):121-123. doi: 10.3969/j.issn.1674-6082.2023.11.029
[11] 杨佐怀, 董越, 郭俊杰, 等. 新疆某金矿选冶联合工艺研究[J]. 矿产综合利用, 2022(3):121-125.YANG Z H, DONG Y, GUO J J, et al. Beneficiation and metallurgical process study for a gold mine in Xinjiang[J]. Multipurpose Utilization of Mineral Resources, 2022(3):121-125. doi: 10.3969/j.issn.1000-6532.2022.03.021
YANG Z H, DONG Y, GUO J J, et al. Beneficiation and metallurgical process study for a gold mine in Xinjiang[J]. Multipurpose Utilization of Mineral Resources, 2022(3):121-125. doi: 10.3969/j.issn.1000-6532.2022.03.021
-