Bored Pile Post-grouting for the Building of the Production Control Center of Fuzhou Water Company
计量
- 文章访问数: 198
- PDF下载数: 10
- 施引文献: 0
引用本文: | 余志文. 福州自来水公司生产调度中心大楼钻孔灌注桩后注浆技术[J]. 钻探工程, 2000, (z1): 31-32. doi: 10.3969/j.issn.1672-7428.2000.z1.012 |
Citation: | Bored Pile Post-grouting for the Building of the Production Control Center of Fuzhou Water Company[J]. DRILLING ENGINEERING, 2000, (z1): 31-32. doi: 10.3969/j.issn.1672-7428.2000.z1.012 |