Borehole Completion Process of Rock Socketed Piles for the Piers of Yongding River No. 2 Bridge
计量
- 文章访问数: 187
- PDF下载数: 11
- 施引文献: 0
引用本文: | 郭玉芳. 永定河2号大桥桥墩嵌岩桩成孔工艺[J]. 钻探工程, 2000, (z1): 33-34. doi: 10.3969/j.issn.1672-7428.2000.z1.013 |
Citation: | Borehole Completion Process of Rock Socketed Piles for the Piers of Yongding River No. 2 Bridge[J]. DRILLING ENGINEERING, 2000, (z1): 33-34. doi: 10.3969/j.issn.1672-7428.2000.z1.013 |