地质出版社有限公司 中国地质科学院勘探技术研究所主办

永定河2号大桥桥墩嵌岩桩成孔工艺

郭玉芳. 永定河2号大桥桥墩嵌岩桩成孔工艺[J]. 钻探工程, 2000, (z1): 33-34. doi: 10.3969/j.issn.1672-7428.2000.z1.013
引用本文: 郭玉芳. 永定河2号大桥桥墩嵌岩桩成孔工艺[J]. 钻探工程, 2000, (z1): 33-34. doi: 10.3969/j.issn.1672-7428.2000.z1.013
Borehole Completion Process of Rock Socketed Piles for the Piers of Yongding River No. 2 Bridge[J]. DRILLING ENGINEERING, 2000, (z1): 33-34. doi: 10.3969/j.issn.1672-7428.2000.z1.013
Citation: Borehole Completion Process of Rock Socketed Piles for the Piers of Yongding River No. 2 Bridge[J]. DRILLING ENGINEERING, 2000, (z1): 33-34. doi: 10.3969/j.issn.1672-7428.2000.z1.013

永定河2号大桥桥墩嵌岩桩成孔工艺

详细信息
  • 中图分类号: TU473.1+4

Borehole Completion Process of Rock Socketed Piles for the Piers of Yongding River No. 2 Bridge

计量
  • 文章访问数:  187
  • PDF下载数:  11
  • 施引文献:  0
出版历程
刊出日期:  2000-12-01

目录